When can aluminum castings be heat treated to T5 or T6?

A temper designation is not evidence. Connect alloy, casting route, thermal cycle, specimen location and component checks in one qualification record before production.

Can an aluminum casting be specified in T5 or T6?

Yes, when the alloy responds to the treatment and the manufacturing route has shown the required results on representative parts. A temper designation alone is not evidence. Before approving production, connect alloy, casting process, thermal cycle, specimen location and final component checks in one qualification record. The practical question is whether this combination meets your drawing consistently.

T5 vs T6: two different thermal routes

T5T6
StepsCooled from casting, then artificially agedSolution treated, quenched, artificially aged
Solution treatmentNoneYes: the step that blisters gas-bearing castings
Typical useStability, moderate strength gainHighest strength in heat-treatable alloys such as A356
Parameters fromThe alloy and the governing specification, not a generic recipe

Rheinfelden's Silafont-36 guidance, for example, describes direct quenching after die removal for its T5 route and a separate solution treatment for T6. That is alloy-specific guidance; do not transfer a cycle from a different material. Start from the required outcome (strength, ductility, dimensional condition, functional tests) and ask which route can demonstrate it. T6 is not a quality grade.

The process name is a starting point

ASTM B917/B917M covers heat treatment of aluminum castings from permanent-mold and other processes; applicability still depends on the material specification or order. High-pressure die castings need a specific discussion: a 2024 study of vacuum-assisted AlSi10MnMg and AlSi10Mg(Fe) parts found blistering under the solution treatment investigated, while the tested T5 avoided visible blisters. That supports qualification on actual parts; it does not prove every vacuum die casting fails T6 or that T5 is defect-free.

Squeeze casting fills at low velocity and solidifies under pressure, which is why it is our route for A356-T6. For any route, ask for the evidence for your application; a process label is not an acceptance report.

Agree the trial before making samples

A planning tool, not limits from a standard.

ItemAgree before the trialExamine afterward
Material identityDesignation, specification, permitted substitutionsMaterial identification linked to the trial parts
Casting routeProduction process, tooling, configurationRecord of how trial parts were made
Thermal routeSequence, controlling document, processorCycle record per trial batch
Component conditionMachining, inspection and finishing stageResults in the drawing's condition
MechanicalRequirements, specimen source, methodResults with specimen and batch ID
Component acceptanceDimensional, integrity, functional checksResults for identified parts, including failures
ApprovalReviewer and decisionSigned decision covering the qualified scope

Ask for the complete result set, including rejected parts. If the trial route differs from production, record the difference and decide what further demonstration is needed.

Connect mechanical results to the component

ASTM B557 notes that specimens from selected portions may not represent the whole product or its service behaviour, and a test method does not supply acceptance limits. Ask for a specimen map: cut from production parts, cast-on, or separately cast. If two quotations use different specimen sources, resolve that before comparing their numbers.

Make the production decision explicit

  1. Approve the demonstrated route. Results complete and acceptable; production scope identified.
  2. Request another trial. A requirement unmet, a result missing, or the trial not representative.
  3. Revise the design or proposal. Reconsider alloy, process, temper or requirement.

Do not release a batch with "T6 capability to be confirmed" open. Changing an acceptance criterion after a failure needs the design authority. Put the qualified thermal route into the inspection plan and the change-notification list: alloy source, tooling, casting route, heat-treatment processor and cycle.

A356-T6 specification Casting inspection plan

Questions about T5 and T6

What is the difference between T5 and T6?
T5 is artificial aging after cooling from casting, without solution treatment. T6 adds solution treatment and quenching before aging.
Does T5 remove the need to inspect the casting?
No. Dimensional, integrity and functional checks stay in the qualification plan.
Can a published T6 property table serve as my acceptance report?
No. Acceptance needs agreed requirements and evidence tied to the material, specimen and component supplied.

Send the drawing and the proposed temper

Howard Ding replies with the route and a qualification plan.

Send a drawing for DFM review

What happens next

  1. Howard Ding confirms receipt and asks for anything missing from the package.
  2. Engineering reviews geometry, alloy and acceptance criteria and proposes a route: squeeze casting, die casting, or a reason neither fits.
  3. You receive the quotation with tooling, samples and validation listed separately from the part price.