QUALITY & TRACEABILITY

Confidence starts with verification.

Define what matters. Agree how it is checked. Keep the results connected to the part.

Confidence starts with verification.

Quality requirements belong at the start

CEX’s published quality approach includes mold checks, incoming material inspection, first-article inspection, process sampling and finished-product inspection. A project review should translate your drawing and application into an agreed inspection plan.

Inspection capabilityWhat it helps evaluate
CMM and dimensional measurementGeometry and critical dimensions against the drawing
SpectrometerMaterial composition
Tensile and hardness testingAgreed mechanical properties
X-ray inspectionInternal casting integrity
Helium leak detectionLeak-tightness under agreed test conditions

Request evidence relevant to your application

The existing CEX site lists ISO 9001 and IATF 16949 certification. Request the current certificate, scope and validity details during supplier qualification. Agree any customer-specific documentation, sampling and acceptance requirements before production.

Inspection equipment alone does not define acceptance. Specify test methods, sampling, calibrated equipment requirements and pass/fail criteria for the actual part.

Can I request an inspection report?

Include the required report and sampling plan in your inquiry so CEX can confirm the scope with the quotation.

Does every part receive every test?

The inspection plan depends on the application and agreement. Confirm which characteristics and tests are required for every part, sample or production lot.

Build a part-specific inspection plan

StageAgreement to record
Before toolingDrawing revision, critical characteristics, test methods and acceptance limits
First samplesDimensional report scope, material and heat-treatment evidence, functional checks
ProductionSampling or 100% checks by characteristic; lot identification and records
Change or nonconformityContainment, disposition, revalidation and approval responsibilities

A useful report connects the result to the part

Request the part number and revision, lot or sample identification, characteristic measured, requirement, actual result and disposition. For a material or mechanical test, include the alloy, heat-treatment condition and specimen information. For a leak test, include the medium, pressure, units and acceptance threshold.

Supplier qualification package

Ask for current certificates and the manufacturing-site scope, a relevant example inspection report, and the proposed project control plan. Certificate validity and customer-specific documentation should be checked during qualification. No customer report is published here without permission.

LET’S BUILD YOUR NEXT PART

A better part starts
with a conversation.

Share your drawing, material and requirements.
We’ll help you identify a suitable manufacturing route.

Send Your Drawing
Send Your Drawing